first graphic

CDBG Projects


CDBG Public Hearing for 2021-2022 Grant Projects -
July 7, 2020, 5:15 P.M. (Pacific Time) on Suite 102 of the Nannini Administration Building, 540 Court Street, Elko, Nevada 89801



Jackpot Storm Water Master Plan (CLOSED)
 
Engineer a storm water master plan for the purpose of mitigating flood damage to the State Highway and drainage system that runs through the town.

Montello Storm Water Master Plan (CLOSED) 
Engineer a Storm Water Master Plan for the purpose of mitigating flood damage to the State Highway and drainage system that runs through the Unincorporated Town of Montello.